Custom Delays

Overrides selected mining and commission-claiming delays. Intended for experienced users.

Custom Delays is an expert panel for the timing behind Polinex's mining helpers. It overrides selected delays used when claiming commissions with the Royal Pigeon and when Auto Refuel calls Jotraeline, so experienced players can fine-tune how fast or slow those steps run in the Dwarven Mines and Glacite Tunnels.

Each setting is a min-max range in milliseconds: Claim Rod Throw, Pigeon Click, Commission GUI First, Commission GUI Next, Post Commission Stop, Post Commission Claim and Refuel Command. A random value from the range is used each time. The defaults suit most players, and the client suggests keeping Commission GUI First above 200ms. Use it with Auto Commission Claimer and Auto Refuel.

Settings 7

Shown at their defaults
  • Claim Rod Throw

    Delay before and after throwing the rod while claiming commissions.

  • Pigeon Click

    Delay before right-clicking the Royal Pigeon.

  • Commission GUI First

    Delay before the first completed commission click after the commission GUI opens. We'd suggest keeping this above 200ms.

  • Commission GUI Next

    Delay before the next commission GUI click after claiming a completed commission.

  • Post Commission Stop

    Delay after a commission complete message before stopping movement.

  • Post Commission Claim

    Delay after stopping movement before starting commission claiming.

  • Refuel Command

    Delay before Auto Refuel sends the Jotraeline call command.

Included with Polinex. See packages

All features